{"id":1388,"date":"2018-07-21T13:41:52","date_gmt":"2018-07-21T11:41:52","guid":{"rendered":"https:\/\/polarkon.net\/?p=1388"},"modified":"2023-07-07T01:41:02","modified_gmt":"2023-07-06T23:41:02","slug":"iga-airport-completed-projects","status":"publish","type":"post","link":"https:\/\/polarkon.net\/en\/news\/iga-airport-completed-projects\/","title":{"rendered":"IGA Airport &#8211; Completed Projects"},"content":{"rendered":"<p><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter wp-image-4763 size-full\" src=\"https:\/\/polarkon.net\/wp-content\/uploads\/2017\/12\/IGA-Airport-Completed-Projects.jpg\" alt=\"\" width=\"950\" height=\"505\" srcset=\"https:\/\/polarkon.net\/wp-content\/uploads\/2017\/12\/IGA-Airport-Completed-Projects.jpg 950w, https:\/\/polarkon.net\/wp-content\/uploads\/2017\/12\/IGA-Airport-Completed-Projects-300x159.jpg 300w, https:\/\/polarkon.net\/wp-content\/uploads\/2017\/12\/IGA-Airport-Completed-Projects-768x408.jpg 768w, https:\/\/polarkon.net\/wp-content\/uploads\/2017\/12\/IGA-Airport-Completed-Projects-320x170.jpg 320w, https:\/\/polarkon.net\/wp-content\/uploads\/2017\/12\/IGA-Airport-Completed-Projects-640x340.jpg 640w, https:\/\/polarkon.net\/wp-content\/uploads\/2017\/12\/IGA-Airport-Completed-Projects-360x191.jpg 360w, https:\/\/polarkon.net\/wp-content\/uploads\/2017\/12\/IGA-Airport-Completed-Projects-720x383.jpg 720w, https:\/\/polarkon.net\/wp-content\/uploads\/2017\/12\/IGA-Airport-Completed-Projects-800x425.jpg 800w, https:\/\/polarkon.net\/wp-content\/uploads\/2017\/12\/IGA-Airport-Completed-Projects-280x149.jpg 280w\" sizes=\"(max-width: 950px) 100vw, 950px\" \/><\/p>\n<h2><span style=\"font-family: Gilroy-Bold;\">IGA Airport Cargo Building, Warehouse Roofing And Facade Cadding Works<\/span><\/h2>\n<p><span style=\"font-family: helvetica; color: #000000; font-size: 15px;\">The steel structure and space frame construction works which are carried out by Polarkon within the scope of Istanbul 3. Airport Pier Structures Projects; are on the completion phase.<\/span><\/p>\n<p><span style=\"font-family: helvetica; color: #000000; font-size: 15px;\">In the following period; roofing and facade covering works of the 4 cargo buildings, warehouse building roofs were also undertaken by our company.<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>IGA Airport Cargo Building, Warehouse Roofing And Facade Cadding Works The steel structure and space frame construction works which are carried out by Polarkon within the scope of Istanbul 3. Airport Pier Structures Projects; are on the completion phase. In the following period; roofing and facade covering works of the 4 cargo buildings, warehouse building<\/p>\n","protected":false},"author":8,"featured_media":4763,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[113],"tags":[],"_links":{"self":[{"href":"https:\/\/polarkon.net\/en\/wp-json\/wp\/v2\/posts\/1388"}],"collection":[{"href":"https:\/\/polarkon.net\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/polarkon.net\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/polarkon.net\/en\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/polarkon.net\/en\/wp-json\/wp\/v2\/comments?post=1388"}],"version-history":[{"count":0,"href":"https:\/\/polarkon.net\/en\/wp-json\/wp\/v2\/posts\/1388\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/polarkon.net\/en\/wp-json\/wp\/v2\/media\/4763"}],"wp:attachment":[{"href":"https:\/\/polarkon.net\/en\/wp-json\/wp\/v2\/media?parent=1388"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/polarkon.net\/en\/wp-json\/wp\/v2\/categories?post=1388"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/polarkon.net\/en\/wp-json\/wp\/v2\/tags?post=1388"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}